Documents

Communication Activities

  • TBO-Met Poster SIDs’17 @ SID’17
  • TBO-Met Poster SIDs’16 @ SIDs’16
  • Slides for the Presentation at SIDs’16 for paper Wind-Based Robust Aircraft Route Optimization using Meteorological Ensemble Prediction Systems. D. González-Arribas, Manuel Soler, Manuel Sanjurjo. SESAR Innovation Days 2016 (SIDs’16).
  • Presentations at the first International Workshop on Meteorology and ATM.
    • Manuel Soler, Universidad Carlos III de Madrid;
Trajectory planning under meteorological uncertainty (TBO-Met project). Presentation
    • Alfonso Valenzuela, Universidad de Sevilla;
Probabilistic sector demand prediction (TBO-Met project). Presentation

Management Activities

Deliverables

List of deliverables

Deliverable number

WP number

Partner

D 1.1. Project management plan

WP 1

USE

D 1.2. TRL-Assessment report

WP 1

USE

D 1.3. Project results final report

WP 1

USE

D 2.1. Requirements and concept for EPS processing

WP 2

MetSol

D 2.2. Software documentation for EPS processing

WP 2

MetSol

D 2.3. Requirements and concept for nowcast processing

WP 2

MetSol

D 2.4. Software documentation for nowcast data

WP 2

MetSol

D 3.1. Survey questionnaire

WP 3

UC3M

D 3.2. Stakeholders’ survey report

WP 3

UC3M

D 4.1. Efficiency/predictability trade-off of 4D trajectories at pre-tactical level

WP 4

UC3M

D 4.2. Efficiency/predictability trade-off of 4D trajectories at tactical level

WP 4

UC3M

D 4.3. Catalogue of case studies for robust trajectory planning

WP 4

UC3M

D 5.1. Methodology to assess the uncertainty of sector demand

WP 5

USE

D 5.2. Effects of weather uncertainty in sector demand

WP 5

USE

D 5.3. Catalogue of case studies for sector demand analysis

WP 5

USE

D 6.1. Report on evaluation and assessment of proposed solutions

WP 6

PLUS

D 7.1. Dissemination plan

WP 7

USE

D 7.2. Exploitation plan

WP 7

USE

D 7.3. Communication plan

WP 7

USE

D 7.4. Data management plan

WP 7

USE

D 7.5. Proceedings of TBOMet workshop

WP 7

USE

D 7.6. TBO-Met press release

WP 7

USE

D 8.1. H – Requirement No. 3

WP 8

USE

D 8.2. POPD – Requirement No. 2

WP 8

USE

D 8.3. POPD – Requirement No. 1

WP 8

USE

Advertisements